  The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.

�

  Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.

�

  Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200 ℃ -1300 ℃ . This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.

�

  Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.

�

�

�

本文来自张弛新老师

更多出国留学最新动态,敬请关注澳际教育手机端网站,并可拨打咨询热线:400-601-0022
  • 专家推荐
  • 成功案例
  • 博文推荐
  • Tara 向我咨询

    行业年龄 8年

    成功案例 2136人

  • Cindy 向我咨询

    行业年龄 20年

    成功案例 5340人

    精通各类升学,转学,墨尔本的公立私立初高中,小学,高中升大学的申请流程及入学要求。本科升学研究生,转如入其他学校等服务。

  • 薛占秋 向我咨询

    行业年龄 12年

    成功案例 1869人

    从业3年来成功协助数百同学拿到英、美、加、澳等各国学习签证,递签成功率90%以上,大大超过同业平均水平。

  • Amy GUO 向我咨询

    行业年龄 18年

    成功案例 4806人

    熟悉澳洲教育体系,精通各类学校申请程序和移民局条例,擅长低龄中学公立私立学校,预科,本科,研究生申请

  • 报名即将截止|在选择蒙纳士-多学院深度交流会(上海站)开启面对面深度咨询

    3101人阅读 查看原文

  • 倒计时开启|4月11日见面,别把和奥大的距离留在屏幕上

    3290人阅读 查看原文

  • 阿德莱德大学2026中国开放日活动报名开启,全球百强名校等你来!

    4592人阅读 查看原文

  • 2026惠灵顿维多利亚大学中国巡回宣讲会重磅回归!offer与奖学金当场锁定!

    3404人阅读 查看原文

我要查

澳际服务

我要读

热门国家申请